Concrete Trench Footing Calculator

Estimate concrete for a trench-poured strip footing dug directly into the ground.

ft
in
in
%

Concrete needed

2.30 yd³

for 40 ft of trench footing

Trench cross-section
216 in²
Cubic feet
62.1 ft³
Cubic yards
2.30 yd³
Bags equivalent
104 bags

Short answer

A 40-foot trench footing, 12 inches wide and 18 inches deep, needs about 2.3 cubic yards of concrete once a 15% waste allowance is added. Trench pours run wider and deeper than they look on paper because dug soil walls are rarely perfectly straight, so a higher waste margin than a formed slab is standard practice.

Typical trench footing sizes by wall type

Wall typeTypical widthTypical depth
Shed or fence wall footing12 in12 in
Garage or small building wall16 in8–12 in
House foundation wall (non-frost area)16–24 in8–12 in
Frost-protected footing (cold climates)16–24 inPer local frost depth, often 24–42 in

How to plan and pour a trench footing

  1. Check your local building code for the required footing width, depth, and frost depth for your wall type.
  2. Dig the trench to the required width and depth, keeping the bottom as level and the walls as straight as practical.
  3. Enter your trench dimensions above, using a higher waste percentage (10–15%+) than you would for a formed slab.
  4. Place any required rebar along the length of the trench, supported off the bottom with spacers.
  5. Pour directly into the trench, using the soil itself as the form, and screed the top level.
  6. Let the footing cure for several days before building on top of it, per your project’s schedule and local code.

Worked example

Trench size
40 ft long × 12 in wide × 18 in deep
Volume
(40 × 12) in × 12 in × 18 in = 103,680 in³ = 60.0 ft³, plus 15% waste = 69.0 ft³
Cubic yards
69.0 / 27 = 2.56 yd³

Common mistakes

  • Using the same waste percentage as a formed slab, which underestimates material for an irregular, hand-dug trench.
  • Digging the trench narrower or shallower than code requires, which can fail inspection or under-support the wall above.
  • Not accounting for cave-ins or oversized digging in loose soil, which increases the actual concrete needed beyond the planned dimensions.
  • Skipping rebar in a footing that will support a wall, risking cracking under load.

Assumptions

  • Standard premix concrete at roughly 150 lb per cubic foot for the bag-equivalent reference figure.
  • Bag yields follow manufacturer averages: 80 lb = 0.60 ft³, 60 lb = 0.45 ft³, 50 lb = 0.375 ft³, 40 lb = 0.30 ft³.
  • Trench cross-section is treated as a uniform rectangle along its full length.
  • Does not include rebar, forms at the ends, or excavation/spoil removal cost.

Frequently asked questions

How wide and deep should a trench footing be?

It depends on the wall and local frost depth — common residential footings run 12 to 24 inches wide and 8 to 12 inches deep in non-frost areas, with much deeper footings required where frost protection is needed. Always check local code.

Why does a trench footing need more waste allowance than a slab?

A formed slab has precise, straight edges, while a hand-dug or machine-dug trench almost never comes out perfectly uniform. Soil walls bulge, cave in slightly, or run a bit oversize, so 10 to 15% or more overage is common.

Does a trench footing need rebar?

Most footings supporting a structural wall include horizontal rebar for tension strength. Check your local code and engineer’s specification for the required size and placement.

Embed this calculator

Free to use on your own site. Copy the code below.

<iframe src="https://materialcalculate.com/embed/concrete-trench-footing-calculator/" width="100%" height="640" style="border:0"></iframe>

Related calculators

Estimates are for planning purposes only. Always confirm quantities, thickness, and local building requirements with a licensed contractor or your building department before ordering material.