Concrete Mailbox Post Calculator

Concrete Mailbox Post Calculator

Size the concrete footing for a mailbox post, sign post, or fence post.

in
in
%

0.06 yd³

for 1 post footing

Hole volume
1.09 ft³
Cubic feet needed
1.09 ft³
Cubic yards
0.04 yd³
Bags needed
3 bags

Everything is calculated in your browser. Nothing you type is sent anywhere or stored.

Short answer

A typical mailbox post footing — a 10-inch-diameter hole poured 24 inches deep — needs a little over 1 cubic foot of concrete, or about 3 bags of 60 lb fast-setting post mix. Heavier sign posts or larger fence posts need a wider, deeper hole and more bags.

Typical post footing sizes

Post typeHole diameter × depthBag size
4×4 wood mailbox post10 × 24 in50–60 lb
6×6 wood post12 × 30 in60–80 lb
Round metal mailbox post8 × 24 in50–60 lb
Heavy sign or fence post12 × 36 in80 lb

How to set a mailbox or sign post

  1. Check local code for the required setback from the road and curb before digging.
  2. Dig or auger a hole at least a third of the post’s above-ground height, typically 24 to 36 inches deep.
  3. Set the post plumb in the hole, brace it temporarily, and check level on two sides.
  4. Enter your hole size above to get the concrete volume, then mix and pour around the post.
  5. Slope the top of the concrete slightly away from the post so water drains off instead of pooling.
  6. Let fast-setting post mix cure for the time on the bag (often 4 hours) before removing braces; standard mix needs 24–48 hours.

Worked example

Hole size
10 in diameter × 24 in deep
Volume
π/4 × 10² × 24 = 1,885 in³ = 1.09 ft³, plus 10% waste = 1.20 ft³
Bags (60 lb, 0.45 ft³ each)
ceil(1.20 / 0.45) = 3 bags

Common mistakes

  • Digging too shallow, leaving the post loose or prone to leaning after a season of frost heave.
  • Not checking plumb before the concrete sets, resulting in a tilted post.
  • Pouring the concrete top flat instead of sloped, which lets water pool and rot a wood post faster.
  • Skipping the local setback check, which can mean redoing the post if it’s placed too close to the road.

Assumptions

  • Standard premix or fast-setting post mix at roughly 150 lb per cubic foot.
  • Bag yields follow manufacturer averages: 80 lb = 0.60 ft³, 60 lb = 0.45 ft³, 50 lb = 0.375 ft³, 40 lb = 0.30 ft³.
  • Hole is treated as a cylinder; the post cross-section can be subtracted using the checkbox above.
  • Does not include the post itself, gravel base, or braces.

Frequently asked questions

How deep should a mailbox post footing be?

24 inches is standard for a typical 4×4 wood mailbox post. Taller posts, heavier sign posts, or areas with deep frost lines may need 30 to 36 inches for stability.

Do I need to subtract the post itself from the concrete volume?

For a rough estimate, most people don’t bother — the post displaces a small amount of volume. Check the box above if you want a more precise number, especially for larger posts.

Should I use fast-setting post mix or standard concrete?

Fast-setting post mix (often poured dry and watered in place) is convenient and sets in a few hours, which is handy for mailbox and fence posts. Standard premix is fine too and can be slightly cheaper for larger jobs.

Embed this calculator

Free to use on your own site. Copy the code below.

<iframe src="https://materialcalculate.com/embed/concrete-mailbox-post-calculator/" width="100%" height="640" style="border:0"></iframe>

Related calculators

Estimates are for planning purposes only. Always confirm quantities, thickness, and local building requirements with a licensed contractor or your building department before ordering material.

Concrete Mailbox Post Calculator

materialcalculate.com
Project inputs
Materials needed
Notes
Generated by materialcalculate.com — estimates only, verify before ordering.