Greenhouse Base Calculator

Get the gravel base right before your greenhouse kit shows up. Enter your greenhouse footprint and base depth, and this calculator gives you cubic yards, tons, bag counts, and delivered cost.

Outdoor StructuresUpdated Free, no sign-upInstant results
ft
ft

A 4 in gravel base is typical for kit greenhouses

in
%

Covers spillage and compaction. 5–10% is normal.

$
$
$
Scale drawing of the area with dimensions
0tons

Crushed run / road base

Cubic yards
0
Cubic feet
0
Bags (0.5 cu ft)
0
Recommended order

—

—

Bulk vs baggedQtyCost

Everything is calculated in your browser. Nothing you type is sent anywhere or stored.

Bags or bulk delivery?

—

Coverage & weight

Density—
Total weight—
Coverage at this depth—
Wheelbarrow loads—

Material profile

A gravel base is calculated by volume, not just area. Multiply the greenhouse footprint (length times width) by the base depth in feet, add a waste percentage for compaction and spillage, and convert the result to cubic yards. Multiply cubic yards by the material’s weight per yard (about 2,800 lb for crushed run) to get tons, then round up to a full order since suppliers sell in fractions of a ton or by the bag.

Base Material Comparison

Crushed run and pea gravel behave differently once they’re down. Pick based on whether you want a compacted, stable base or a permeable, finished floor.

Weight and drainage by material
MaterialWeight per Cu YdDrainage
Crushed run / road base2,800 lbPoor once compacted (by design, for a stable base)
Pea gravel2,600 lbGood, some fines

Greenhouse base material weight by type

Approximate weight of one cubic yard, by type.
TypeWeight per yd³Best forDrainage
Crushed run / road base2,800 lbCompactable level base for framed kitsPoor once compacted (by design)
Pea gravel2,600 lbGood drainage, permeable floor optionGood, some fines

Figures are for dry material. Wet or freshly delivered material can weigh noticeably more.

How to calculate base gravel you need

Tons = (Length × Width × Depth (ft) × (1 + Waste%) / 27) × (Lb per Cu Yd / 2000)
  1. Measure your greenhouse footprint, length by width in feet.
  2. Choose your base depth, typically 4 in for a compacted crushed run base under a framed kit.
  3. Convert the volume to cubic yards and add a waste percentage for compaction and spillage.
  4. Multiply cubic yards by your material’s weight per yard to get tons.
  5. Round up to the tonnage your supplier sells, or convert to bags if you’re buying bagged material.

Worked example

For a 10 x 8 ft greenhouse footprint, 4 in of crushed run, and 10% waste:

  • Footprint10 x 8 ft
  • Depth4 in
  • Area80 sq ft
  • Waste factor10%
  • Volume needed29.3 cu ft (1.09 cu yd)
  • MaterialCrushed run / road base (2,800 lb/cu yd)
  • Tons to order1.75 tons
  • Delivered cost$169.00
ProjectRecommended depthNotes
Framed greenhouse kit base4-6 inCompactable base like crushed run under a level sill or frame
Gravel floor / walking surface2-4 inPea gravel or similar for a permeable, finished floor
Raised bed or planting area base2-3 inThin drainage layer under soil, not a structural base
Cold-climate frost protection6-8 inDeeper compacted base helps resist frost heave under a permanent foundation

Bags or bulk delivery?

An 80 sq ft greenhouse base sits right at the edge of what’s practical in bags. This example needs about 1.75 tons delivered in bulk, or roughly 59 bags of bagged gravel. Bulk usually wins on cost per ton, but a small footprint like this can still make sense in bags if you don’t have truck access or a place for a bulk drop.

  • Go bulk if you can get truck accessdelivery minimums are usually built around 1+ ton loads, and cost per ton drops fast past that.
  • Go bags for tight accessno driveway clearance for a dump truck, or a base behind a fence or gate, favors 40-50 lb bags.
  • Check the delivery fee separatelybulk pricing often includes a flat delivery charge on top of the per-ton material cost.
  • Round up your tonnage ordersuppliers sell by the half or quarter ton, so your order total will be rounded above the raw calculated tonnage.

Common mistakes

  • Skipping compactionan uncompacted base settles unevenly and can throw a framed greenhouse kit out of square.
  • Using the wrong depth for the climatecold climates with real frost heave need a deeper, more stable base than the standard 4 in.
  • Not accounting for delivery minimumsa small footprint like 80 sq ft may fall under a supplier’s bulk delivery minimum, making bagged material the more practical choice.
  • Skipping landscape fabricwithout it, weeds grow through the base and crushed run gradually works its way into the native soil.

What this calculator assumes

Adjust your result if your project differs from these.

  • Footprint is entered as a rectangular length by width
  • Depth is uniform across the entire base, no sloped grading
  • Waste percentage covers compaction settling and spillage during placement
  • Tonnage is based on the standard weight per cubic yard for the material chosen
  • Does not include a poured concrete footing or perimeter foundation, only the loose base material

Common questions

How deep should a greenhouse gravel base be?

4-6 in of compacted crushed run is standard for a framed kit. Cold climates with frost heave concerns may need 6-8 in.

Crushed run or pea gravel, which is better for a greenhouse floor?

Crushed run compacts into a stable, level base and is the standard choice under framed kits. Pea gravel drains well and works as a finished, permeable floor but doesn’t compact as firmly.

Do I need to compact the base before setting up the greenhouse?

Yes. Compact in shallow lifts with a plate compactor. An uncompacted base settles unevenly and can throw the kit’s frame out of square.

Can I skip the gravel base and set the greenhouse on soil?

You can, but soil shifts with moisture and won’t stay level, which stresses a framed kit’s joints and glazing over time.

Is it cheaper to buy gravel in bulk or bags for a small greenhouse base?

Bulk usually costs less per ton but comes with a delivery fee and truck access requirements. For a small footprint with tight access, bagged material can be more practical even at a higher per-ton price.

Embed this calculator

Free to use on your own site. Copy the code below.

<iframe src="https://materialcalculate.com/embed/greenhouse-base-calculator/" width="100%" height="900" style="border:1px solid #DFE6EA;border-radius:4px" title="Greenhouse Base Calculator"></iframe> <p><a href="https://materialcalculate.com/tools/greenhouse-base-calculator/">Greenhouse Base Calculator</a> by MaterialCalculate</p>

Greenhouse Base Calculator Estimate

—

MaterialCalculate
materialcalculate.com/tools/greenhouse-base-calculator/

Project

Shape—
Dimensions—
Depth—
Area—
Material—
Waste allowance—

Volume & weight (incl. waste)

Cubic yards—
Cubic feet—
Weight—
Tons (rounded up)—

Shopping list

Bulk order—
Bagged alternative (0.5 cu ft)—
Estimated cost—

Notes

Estimate generated by materialcalculate.com. Assumes uniform depth and standard dry material densities. Confirm quantities with your supplier before ordering.